Construction of ground technological water reservoirs with the capacity of 34 500 m3 by Syczyn OU-2H well site in Syczyn, Gmina Wierzbica

The task was to construct two ground reservoirs with a total capacity of 34 500 m3 intended for use during the fracturing process in the well for shale gas exploration.

Zakres obejmował:

  • earthworks related to excavation and embankments of reservoirs
  • sealing the reservoirs with 2 mm HDPE geomembrane – welded, laid on geotextile.
  • installation of steel entrance stairs to the reservoirs and construction of water connections from the existing wells and hydrant to fill reservoirs with water
  • securing the reservoirs with fencing and signage.

_MG_0399_MG_0379_MG_0410

Construction of the access road and the well site Czarna Wieś 1 in Gnin, Gmina Rakoniewice

The task was to perform a comprehensive preparatory work related to the implementation of the borehole.

The scope included:

  • renovation of the county road over a distance of 730 m,
  • construction of the county road exit
  • construction of 520 m of gravel road – access to drilling rig,
  • execution of earthworks for land leveling
  • construction of the 8,400 m2 cement slabs site, on the sand bed together with related works (sealing with welded 1,5mm foil, construction of drainage bands, construction of well cellar, construction of the foundations for the drilling rig, etc.)

Construction of the access road and the well site Stręczyn OU-1 in Gmina Cyców, Łęczna country

The task was to perform a comprehensive preparatory work related to the implementation of the borehole.

The scope included:

  • execution of administrative work related to the preparation of drilling (ie. negotiating contracts with the owners of land plots for drilling, obtaining permits to conduct construction work, etc.),
  • construction of 675 m gravel access road to the well site,
  • construction of the exit from the public road,
  • execution of earthworks for land leveling,
  • hardening of the square over the surface of 10 000 m2 with concrete slabs arranged on the sand bed,
  • sealing the area of over 10 000 m2 with 2 mm welded HDPE foil,
  • drilling conductor for further drilling
  • execution of the related works (drainage band and rainwater tanks, sewers, well cellar, foundations for drilling equipment, etc.)

 

Construction of Gapowo B-1 well site in Gapowo, Gmina Stężyca

The task was to perform a comprehensive preparatory work related to the implementation of the borehole.

The scope included:

  • execution of earthworks for land leveling,
  • construction of 10 000 m2 gravel well site, including the related works tłuczniem wraz z robotami towarzyszącymi (sealing with 1,5mm HDPE foil, drainage band and rainwater tanks, sewers, well cellar, foundations for drilling equipment, etc.)

Zabiala-1

Toruń TG-2

 

Siennica-1

Sedziszow 33K

 

Lapanow 2

Pola-2

Nienadowa 1

Krupe-1

Babica-2